CREATION OF FAULT-TOLERANT IT INFRASTRUCTURE

CJSC AVIASTAR-SP

GOALS AND OBJECTIVES

  • BUSINESS OBJECTIVE

    To create a modern IT infrastructure capable of supporting rapid growth and the integration of new technologies.

  • IT OBJECTIVE

    The upgrade of existing network and engineering IT infrastructure and the introduction of a modern, fault-tolerant software and hardware platform for systems that are most critical to the enterprise.

SOLUTION

  • Cisco equipment-based LAN core.
  • Technical solutions from Eaton (uninterrupted power supplies) and Emerson (conditioners) are used for the data center.
  • An IBM Power-based high-performance computing system and EMC data storage systems.
Solve a similar problem

IMPLEMENTATION

During the first stage of the project, Jet Infosystems developed a long-term concept for IT-infrastructure development at the Ulyanovsk Aviation Plant.


Construction of the data center and LAN modernization were carried out in parallel. Jet Inforsystems laid out a project for a data transmission network and created a detailed plan for interfacing the existing network with a new one. The integrator's specialists upgraded the computer network backbone by moving it to 10 Gigabit Ethernet technology, increasing the bandwidth by several times. At the same time, the potential LAN scalability has also increased by several times.


In this implementation, Jet Infosystems was responsible for the technical design of the data center, while construction works were carried out by Aviastar-SP employees.


One of the most critical tasks during the course of this project was the transfer of the production information system to the new platform, given that this system stores the main design documents and digital models of aircraft components and their assembly units. The system is in commercial use, of course, therefore the migration had to be carried out taking into account the significance of service downtime and without allowing any loss of production data.

Read more

PROJECT RESULTS

This project has firmly laid the foundations for the further development of the enterprise’s IT infrastructure. To date, all planned business-critical applications have already been moved to the new IT platform.
  • 15 days

    Time for building the LAN core

  • 6 months

    Time for construction of the data processing center

  • 20 objects

    Monitored by SolarWinds software

CUSTOMER REVIEW

The solution implemented by Jet Infosystems ensures the stable operation of the IT services group and helps us avoid risks associated with power failures, hardware components failures, preventive maintenance equipment shutdown, and user error.

Alexey Gumennikov

Head of Information Technology Department, CJSC Aviastar-SP

DO YOU HAVE A SIMILAR PROBLEM?

I have read and agree to the privacy policy

By continuing to use this site, you consent to the processing of your personal data using the Internet services Yandex Metrika and Google Analytics. The procedure for processing your personal data, as well as the implemented requirements for their protection, are set out in the PDN Processing Policy. If you do not agree with the processing of your personal data, you can disable the storage of cookies in your browser settings.