CONSTRUCTION OF A NEW DATA CENTER

UTKONOS ONLINE

GOALS AND OBJECTIVES

  • BUSINESS OBJECTIVE

    To ensure continuous uninterrupted operation of the trade network and information security in the event of equipment and/or software failure, or employee error.

  • IT OBJECTIVE

    To build a new data center given a recent increase in the number of outlets and customers.

SOLUTION

  • A geographically distributed fault-tolerant SAP R3 cluster, including an Oracle DBMS server.
Solve a similar problem

IMPLEMENTATION

The Jet Infosystems IT team was tasked with designing and building the engineering infrastructure and computing systems for ERP operations and other company information systems.


Jet Infosystems specialists managed data center construction, monitoring every stage performed by contractors during building and installation, and finally preparing systems for launch. The data center is located in two different buildings.


In order to provide the engineering infrastructure for the data center, the following subsystems were installed and commissioned: air conditioning, gas fire extinguishers, embedded channels and cable channels, an uninterruptible power supply with power distribution network for server rooms, a structured cabling subsystem, and a number of additional subsystems, including a general power supply and emergency lighting.


Further, the team designed a geographically distributed SAP R3 failover cluster. The team backed up key components of the IT infrastructure, in order to ensure the continuity of information systems in the event of an equipment failure.

 
Equipment is currently being serviced by Jet Infosystems.

Read more

PROJECT RESULTS

Utkonos stores are now managed from a single data center. The main elements of the systems complex are being supported round-the-clock ghbbvvbc under Jet’s 24x7 Operational Support program. In addition to overall support for the entire system, this program provides a guaranteed period for full recovery of system functionality.
  • > 160

    Number of outlets

  • 65,000

    Items sold

  • 24 * 7

    System support schedule

  • 370 kW

    Power of the air conditioning system

CUSTOMER REVIEW

Having run a closed bid competition to select the general contractor for our project, we came to the conclusion that Jet Infosystems specialists would be best suited for the work we required. Jet Infosystems has all the required experience, having previously created similar systems. They also have highly qualified project personnel and are competent project managers.

S.F. Shishkov

Deputy General Director, New Impulse

All client projects

view more projects

DO YOU HAVE A SIMILAR PROBLEM?

I have read and agree to the privacy policy

By continuing to use this site, you consent to the processing of your personal data using the Internet services Yandex Metrika and Google Analytics. The procedure for processing your personal data, as well as the implemented requirements for their protection, are set out in the PDN Processing Policy. If you do not agree with the processing of your personal data, you can disable the storage of cookies in your browser settings.

Read more